We added another 500 meter of 2″ water pipe above our existing reservoir and pipe line. We were lacking flow on the farm and not enough height on the water head to make it to the village. This extension has solved most of our flow problems on the farm and has now brought water to the village. It also serves as a way to fill up the reservoir. Which came in handy when the reservoir almost dried up. We are able to turn on a valve and fill it up over night. A very successful addition to our work in the village.